青青草色青伊人,日韩一区二区三区在线观看,中文字幕欧美在线,日韩一区二区三区不卡视频,欧美在线成人免费国产,日本视频一区二区三区,曰本人体

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
Loader after inspection and maintenance work
Public date:2015-1-21   Hits:17980

After work each day to check:

1) Check the fuel reserves.
2) Check the engine oil sump and clean the case, if found too high and thinning the oil, should find out the cause and be excluded.
3) Check the tubing, pipes, pipe and various accessories for leakage.
4) Check the transmission, torque converter, hydraulic pumps, steering, front and rear axles fixed seal and the presence of overheating.
5) Check the rim bolts, and each pin driveshaft bolts loose or fall off.
6) whether the normal working device.
7) Check the tire pressure is normal appearance and.
8) the temperature is below 1 ℃ (near freezing) when the cooling water release, if you have added antifreeze, do not release. (Note: The loader factory not add antifreeze).
9) inspection equipment and various parts of the shaft sleeve lubrication.
10) Clean machine appearance and inner bucket of mud and debris.

Previous  |  Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點擊這里給我發(fā)消息
點擊這里給我發(fā)消息